Day 1: Introduction to PSA, Introduction to LFA
1 Lesson-
StartDay 1: Introduction to PSA, Introduction to LFA
-
-
Day 5: Recap of transformer parralle operation, load modelling and transmission line modelling
2 Lessons -
Day 6: Transmission line loss & FE calculation, SIL, Generator capability curve & Modelling
3 Lessons -
Day 9: Reactive power compensation, capacitor bank sizing, Synchronous condenser modelling & Hands-on session
2 Lessons -
Day 10: Cable modelling, Cable Resistance calculation, WTG modelling & Hands-on session
1 Lesson-
StartDay 10: Cable modelling, Cable Resistance calculation, WTG modelling & Hands-on session
-
-
Day 11: Case study of WTG and station controller. Introduction to SCA
1 Lesson-
StartDay 11: Case study of WTG and station controller. Introduction to SCA
-
-
Short circuit Analysis
14 Lessons-
StartDay 1: Introduction to SCA, Standards, Assumptions, Fault near & far from generator, Grid inputs
-
StartDay 2: Grid modelling, Impedance calculation, Significance of X/R
-
StartDay 3: Transformer fault current calculation, C-factor
-
StartDay 3: Notes
-
StartDay 4: Sequence Diagram
-
StartDay 4: Excel
-
StartDay 5: Earthing transformer modelling, NGR and NGT modelling, Transmission line sequence network and modelling
-
StartDay 5: Excel
-
StartDay 5: Notes
-
StartDay 6: Methods of limiting fault current at different voltage level, Case study practice exercise
-
StartDay 6: Excel
-
StartDay 7: Case study practice exercise
-
StartDay 8: Case study practice exercise
-
StartDay 8: Excel
-
-
Relay Coordination Study
27 Lessons-
StartDay 1: Introduction to Protection study and LV Protection
-
StartDay 1: Excel
-
StartDay 2: LV Protection modelling and settings
-
StartDay 2: Excel
-
StartDay 3: LV Protection trip units, LV motor modelling and LV motor protection
-
StartDay 3: Excel
-
StartDay 4: LV capacitor bank protection and LV trip unit coordination
-
StartDay 4: Excel
-
StartDay 5: MV Motor modelling (TypAsm1) and MV motor protection
-
StartDay 5: Excel
-
StartDay 6: MV Motor overcurrent protection and transformer overcurrent protection
-
StartDay 6: Excel
-
StartDay 1: Review of Load Flow and Q&A
-
StartDay 1: Digsilent Q&A Notes
-
StartDay 1: List of Studies for HVDC and FACTS
-
StartDay 1: Notes
-
StartAssignment Digsilent PF - 1
-
StartDay 7: MV Incomer protection and TCC coordination
-
StartDay 7: Excel
-
StartDay 8: Directional overcurrent protection
-
StartDay 8: Excel
-
StartDay 9: Directional overcurrent protection - Modelling and simulation
-
StartDay 9: Excel
-
StartDay 10: Transformer protection - Introduction and Differential protection concepts
-
StartDay 10: Excel
-
StartDay 11: Transformer protection - Modelling and differential settings calculation
-
StartDay 11: Excel
-